| 1. |
Identify
sketches
|
--- |
| 2. |
Identify
preliminary drawings
|
---
|
| 3. |
Identify
contract documents
|
--- |
| 4. |
Identify
working drawings
|
--- |
| 5. |
Identify
as-built drawings
|
--- |
| 6. |
Identify
the relevant order of importance of drawings
|
--- |
| 7. |
Assist
in the coordination of drawings with respect to design sequencing
|
--- |
| 8. |
Compile
a reference set of drawings
|
--- |
| 9. |
Follow
procedure to maintain logs of reference information relating to various
disciplines within a project
|
--- |
| 10. |
File Management
See textbook page 125
|
--- |